Construction Consulting & Program Management Services
![Example](https://theloganco.com/wp-content/uploads/2022/06/Field-work.jpg)
Our Services
Design Support
What You Should Expect
- Skilled Value Engineering Support
- Sequence of Operation Review
- LEED energy concepts
- GMP quality requirements are verified
![Image](https://theloganco.com/wp-content/uploads/2022/06/20190420_144650.jpg)
Construction Field Support
![cranes installing equipment into a building](https://theloganco.com/wp-content/uploads/2022/06/crane3.jpg)
- On-site Field Supervisor Support
- Project Execution collaboration (scheduling, oversight, and verification)
- Quality Reviews (System walkdowns, Commissioning/ Validation Readiness)
- TOP (Turn-Over Package Development)
Commissioning/Validation Support/Project Turn-Over
![3-d rendering of nutches](https://theloganco.com/wp-content/uploads/2022/06/Nutches.jpg)
![Nutches completed project](https://theloganco.com/wp-content/uploads/2022/06/Nutches-2.jpg)
The Logan Process
01.
Preconstruction / Programming
![two employees conversing on a job site](https://theloganco.com/wp-content/uploads/2022/05/design-support-photo.jpg)
Feasibility Assessment Support
Program Budget
Construction Cost Estimating
FMEA Development (Validation Requirements)
Concept Design Programming
Facility Programming
Labor Productivity Analysis
Value Engineering/Management
Pre-Purchase Assistance
02.
Engineering and Design
![3-d rendering of a glass lined vessel](https://theloganco.com/wp-content/uploads/2022/06/Glass-Lined-Vessel.jpg)
Design Assist/ Spec. Review and Support
Risk Mitigation Verification (FMEAs)
Technical Support
Energy Solutions
Value Engineering consulting
03.
Construction
![zoomed in photo of a glass lined vessel](https://theloganco.com/wp-content/uploads/2022/06/Glass-Lined-Vessel-2.jpg)
Validation Protocol Development
Turn Over Package Documentation (Validation readiness) Development
Construction Progress Verification
Calibration Services
Construction Management and Supervision
Facility Operations Documents (SOPs)
Project Performance Verification
04.
CQV/Close-Out/ Turnover
![two employees installing equipment](https://theloganco.com/wp-content/uploads/2022/06/Field-work2.jpg)
Facility Start-Up
Independent Commissioning
Independent Validation Execution
Project Turn Over Package
Facility Operations Support